11 results
20-F/A
2021 FY
LOMA
Loma Negra Compania Industrial Argentina Sociedad Anonima
28 Dec 22
Annual report (foreign) (amended)
3:26pm
, a laboratory, a truck scale, an ore belt, a loading tunnel, a meteorological station, a safety trench and a septic tank.
The total cost of the mining
20-F/A
2021 FY
EX-96.1
LOMA
Loma Negra Compania Industrial Argentina Sociedad Anonima
28 Dec 22
Annual report (foreign) (amended)
3:26pm
geotechnical studies and geotechnical design evaluated are stable since the analyses show safety factors greater than the minimum acceptable.
Mining activities … are appropriate for the configuration of the La Pampita rock massif, developing them with high safety standards.
The information verification
F-6
EX-99
LOMA
Loma Negra Compania Industrial Argentina Sociedad Anonima
28 Nov 22
Registration for ADRs (foreign)
2:34pm
business, or at the request of the Company typewritten and photocopied on plain or safety paper, and shall be substantially in the form set forth in the form
20-F
fqt2ux tmdify
27 Apr 18
Annual report (foreign)
4:56pm
- Prev
- 1
- Next